Marina Procedures and Forms

  1. Berthing Agreement 2018
  2. Tropical-Cyclones-Vessel-Preparation-Procedure
  3. Protecting our Waterways
  4. Code of Conduct
  5. Troubleshooting Guide – Electrical
  6. WHS Contractor Induction Handbook – Nov ’17
    • Note for CONTRACTORS:  All contractors wishing to undertake any work within the Abell Point Marina precinct are required to complete a Work Health and Safety Site induction and register with the marina office.It is imperative that all workers are aware of the variety of hazards inherent within a marina environment, marina policies and rules, and what to do in the event of an emergency, all the while ensuring that the highest standard of professionalism is upheld when within Abell Point Marina.All workers are to read the Contractor WHS Site Induction handbook and complete the questionnaire in the back, sign and return to the Abell Point Marina office or email a signed copy to shaz@abellpointmarina.com